|
|
العربية | User Login | Site Map | FAQ | Contact Us |
|||||||
|
|
||||||||
|
|
||||||||||||||
|
Jabal Omar Project |
||||||||||||||
|
à Working in the southern side : Sami Rock Company is the leader in rock cutting works in Saudi Arabia. The company is executing mega projects at big investments in highly strategic and important locations, such as Jabal Omer project, which is implemented on an area exceeding 150,000 square meters. Volume of rocks in the project is estimated more than 2.5 million cubic meters, at a cost of more than SR200 million. The critical nature of the project emerges from the following: · It is surrounded by buildings from all sides · It is only a few meters from the courts of the Holy Mosque · Work in the project is actively progressing to meet the deadline. A team of more than 300 administrators and technicians is managing the project, where layouts and studies are prepared on the site by professional and highly experienced technicians. In addition, the project is supervised by a team of highly efficient engineers. Latest technologies are used in survey works as per layouts made by the owner. · Location Makah, Western Area, Kingdom of Saudi Arabia · Project borders North : Umm Al Qura street East : Ibrahim Al Khalil street South : Residential buildings West : Residential buildings · Geological structure of the mountain: Solid igneous rocks (granite, granodiorite), embedded with faults and cracks, in addition to quartz veins. · Start of implementation Work started in Southern Jabal Omar project in Moharram 1429H · Contract period 12 - 18 months · Implementation technology Perforation, careful blasting, and transportation by trucks. · Equipment The following equipment have been provided for this highly important project: 1. Perforation breakers. 2. Cleaning excavators for preparing perforation areas and opening roads in the location. 3. Bulldozers for collecting rocks after blasting. 4. Shovels for loading rocks on trucks. 5. Fractum Breakers, which are specifically designed for breaking huge boulders. 6. Trucks for transporting rock debris 7. Water tankers to protect the environment through spraying water to prevent dust from becoming airborne. à Working in the northern side: Successes and great achievements of Sami Rock Company in the Southern side has made Saudi Oger, the contractor of the project, to commission Sami Rock Company to execute a 1,000,000 cubic meters of rock cutting operations on an area of more than 45,000 square meters. An action plan was developed and approved. Operations started in Rabi' 1, 1430H. The project is expected to complete within 12 months. Do you need crushed rocks? If yes, then please give us a call at ( +966 2 607 7336 ) or send an email to info@samirock.com |
||||||||||||||
| Home ׀ About Us ׀ Services & Products ׀ Projects ׀ Our Clients ׀ Careers ׀ Gallery ׀ Download |
Site Map | FAQ | Contact Us |
|
| Copyright © 2010 SAMI ROCK COMPANY LTD. All rights reserved. Terms of Use ׀ Privacy Policy ׀ Legal Notice | ||